52. What is the difference between a well-designed control and evidence that it operated?

EasyControls, risk & assurance

Technical
Show model answer

Design concerns whether the control could address the stated risk if performed as intended. Operating evidence shows whether the required activity actually happened, for the relevant period and population.

Ask the responsible owner for evidence appropriate to the control, including exceptions and review. A written policy, configured system, or management assertion alone may not demonstrate that the control worked consistently.

What interviewers listen for

  • Separate intended design from actual performance
  • Check the period and population covered
  • Review evidence and exceptions