43. A shift has 420 minutes of net production time and demand for 210 units. What is takt time, and how is it different from cycle time?
EasyProcess & industrial operations
Technical
Show model answer
Takt time is the demand-paced interval: 420 divided by 210 gives two minutes per unit. Cycle time describes how long a process or station actually takes under a stated definition.
Compare them with consistent time and product boundaries, including the effects of downtime, changeovers and yield. A nominal station cycle below takt does not alone establish that the whole operation can reliably satisfy demand.
What interviewers listen for
- Calculate two-minute takt
- Separate demand pace and actual process time
- Check losses and system-level delivery