41. A machine runs for 6 hours in an 8-hour shift. Why is 75% not automatically an effectiveness score?
MediumFlow & capacity
Technical
Show model answer
Six divided by eight is 75% of the stated shift, but the intended measure depends on planned exclusions and definitions. Runtime alone says nothing about speed while running, acceptable output or whether the schedule required eight productive hours.
I'd reconcile the time basis and relevant performance and quality measures. Calling every runtime percentage overall effectiveness can conceal losses or planned downtime, and comparisons need consistent definitions, not labels.
What interviewers listen for
- Calculate runtime share conditionally
- Check the planned time basis
- Separate availability from speed and quality